TE-WILBUR OPERATIONS MANUAL REV 002.15 06/11/2015
Tisch Environmental 1-TSP-AND-PM10 sales@tisch-env.com www.tisch-env.com Page 136 of 183
2. There are (3) connectors on the pump controller board, one for
24VDC, the pump connection and the other for the control signal.
Unplug the three connectors.
3. Remove the (4) 6-32x3/8” screws that secure the board to the back
panel.
4. Install a new pump controller board and secure with the (4) screws.
5. Plug connectors back into board.
6. Reinstall the upper and lower fronts panel and power unit on.
Pump Connection
Control signal
24VDC Connection