Loading...
TE-WILBUR OPERATIONS MANUAL REV 002.15 06/11/2015
Tisch Environmental 1-TSP-AND-PM10 sales@tisch-env.com www.tisch-env.com Page 143 of 183
5. Install the new relay onto the DIN rail it is installed in the same
manner as the controller by placing the top part into the DIN rail
groove and pushing down until a ‘click’ is heard and felt.
6. Reattach the wires by pushing down on the slot with a small flat-head
screwdriver and pushing the wire into the terminal. The wiring
diagram is as follows:
Terminal
Connection
A2
Neutral
A1
Hot
11
DC (-)
12
Controller TB1 Terminal 3
7. Reinstall the upper and lower front panels and power unit on.
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com