Loading...
TE-WILBUR OPERATIONS MANUAL REV 002.15 06/11/2015
Tisch Environmental 1-TSP-AND-PM10 sales@tisch-env.com www.tisch-env.com Page 48 of 183
8. Unscrew the threaded insert.
9. Wipe down the threaded insert and the inside of the body where it
inserts into with a lint-free laboratory wipe.
10. Inspect the o-ring on the outer lip of the threaded insert for wear or
damage. Replace if worn or damaged.
11. Thread the threaded insert back into the cyclone body.
12. Place a small amount of o-ring grease around the o-rings on the
connector tubes.
13. Push the connector onto the tubes.
14. Thread the collector cup back into the body.
15. Wipe out the bottom exit of the cyclone with a lint-free wipe.
16. Place back onto filter holder and push downtube back onto top of
cyclone.
17. Ensure to place the PM10 inlet back onto unit prior to sampling.
The TE-PM2.5C Fractionator has the following O-rings that should be
inspected for wear and replaced as needed.
Quantity
Description
Part Number
2
Exit Nozzle O-Rings
TE-W-031
1
Collector Cup O-Ring
TE-W-032
1
Threaded Insert O-Ring
TE-W-033
2
Connector tube O-Rings
TE-W-034
2
Stainless steel bolt O-Rings
TE-W-035
These can also be ordered together in a kit by part number TE-W-030.
5.5 Placing of the Cyclone and PM10 Head
To sample for PM10 you would install the downtube onto the top of the filter
holder and then the TE-PM10 head onto the top of the downtube.
To sample for PM2.5 you would install the TE-PM2.5C onto the top of the
filter holder, then the downtube and lastly the TE-PM10 head on top of the
downtube.
NOTE: The downtube adapter has o-rings inside of it to prevent water from
entering the enclosure. Ensure these o-rings are greased when
removing and installing the downtube.
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com