Loading...
TE-WILBUR OPERATIONS MANUAL REV 002.15 06/11/2015
Tisch Environmental 1-TSP-AND-PM10 sales@tisch-env.com www.tisch-env.com Page 93 of 183
value.
Ambient temperature
updated
The ambient temperature sensor was calibrated and updated to a
new value.
Mains power lost
The system lost mains (AC) power and is now running on reserve
DC power.
Power Fail
The system lost mains (AC) power and also reserve DC power
and powered down completely.
Pump maintenance needed
The pump maintenance timer which is set to 5,000 hours has been
exceeded. Indicating that pump maintenance is needed.
High system pressure
shutdown
The system pressure reached 250 H2O of vacuum pressure this
will shut down a sample.
Flow Check Setpoint 1-4
Started
The operator has started a flow verification and used setpoint 1
thru 4.
Screen battery needs
replaced
The battery in the touchscreen needs replaced. This battery is
crucial for proper system operation see 12.0 Maintenance for
instructions on replacing the screen battery.
Battery Discharged
The internal batteries have reached a voltage level where they are
fully depleted.
Battery failure replace
batteries
The internal batteries have failed and need replaced. See section
12.0 Maintenance for instruction on replacing the battery pack.
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com