Loading...
TE-5170 TSP MFC 13 Operations Manual
Gabled Roof Assembly
The following steps are accompanied by pictures to aid your understanding of gabled
roof assembly. Please be aware that the pictures are standardized and may not
exactly match the equipment that you are using. The gabled roof is used on several
products and the assembly procedure is the same.
Lid Hardware
5 pcs 10-24 x 1/2 pan head screws
5 pcs 10-24 stop nuts
1 pc 6-32 x 3/8 pan head screw
1 pc 6-32 hex nut
1 pc " chain with S hook
1 pc TE-5001-10-9 roof back catch
1 pc TE-5001-10-10 front catch
1 pc TE-5001-10-11 rear lid hasp
Step 1
Secure TE-5001-10-10 front catch to the
shelter using 2 10-24 pan head screws
with stop nuts. *Do not tighten completely,
this may need to be adjusted after final
assembly*
Step 2
Secure TE-5001-10-9 roof back catch to
the back of shelter using #6-32 pan head
screw with stop nut.
Step 3
Secure TE-5001-10-11 rear lid hasp inside
the lid with the slot angled up using (2)
#10-24 pan head screws with stop nuts.
*Do not tighten completely, this may need to
be adjusted after final assembly*
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com