Loading...
TE-1000 PUF 13 Operations Manual
Gabled Roof Assembly
Lid Hardware
5 pcs 10-24 x 1/2 pan head screws
5 pcs 10-24 stop nuts
1 pc 6-32 x 3/8 pan head screw
1 pc 6-32 hex nut
 pc " chain with S hook
1 pc TE-5001-10-9 roof back
catch
1 pc TE-5001-10-10 front catch
1 pc TE-5001-10-11 rear lid hasp
Step 1
Secure TE-5001-10-10 front catch to the
shelter using 2 10-24 pan head screws
with stop nuts. *Do not tighten completely,
this may need to be adjusted after final
assembly*
Step 2
Secure TE-5001-10-9 roof back catch to
the back of shelter using #6-32 pan head
screw with stop nut.
Step 3
Secure TE-5001-10-11 rear lid hasp
inside the lid with the slot angled up
using (2) #10-24 pan head screws with
stop nuts. *Do not tighten completely, this
may need to be adjusted after final
assembly*
Step 4
Remove (4) #10- x ½ pan head screws
from the rear of the shelter, attach the lid
to the shelter by placing the lid hinge
plates on the OUTSIDE of the shelter,
line the hinges up with the (4) threaded
holes in the back of the shelter. Use the
(4) #10-X ½ pan head screws that
were removed preciously to attach the lid
hinges to the shelter. *Tighten
completely*
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com