Loading...
TE-5170D-BL TSP MFC 13 Operations Manual
Gabled Roof Assembly
The following steps are accompanied by pictures to aid your understanding of
gabled roof assembly. Please be aware that the pictures are standardized and
may not exactly match the equipment that you are using. The gabled roof is
used on several models and the assembly procedure is the same.
Lid Hardware
5 pcs 10-24 x 1/2 pan head screws
5 pcs 10-24 stop nuts
1 pc 6-32 x 3/8 pan head screw
1 pc 6-32 hex nut
1 pc 20" chain with “S” hook
1 pc TE-5001-10-9 roof back catch
1 pc TE-5001-10-10 front catch
1 pc TE-5001-10-11 rear lid hasp
Step 1
Secure TE-5001-10-10 front catch to the shelter using 2 10-
24 pan head screws with stop nuts. *Do not tighten
completely, this may need to be adjusted after final
assembly*
Step 2
Secure TE-5001-10-9 roof back catch to the back of shelter
using #6-32 pan head screw with stop nut.
Step 3
Secure TE-5001-10-11 rear lid hasp inside the lid with the
slot angled up using (2) #10-24 pan head screws with stop
nuts. *Do not tighten completely, this may need to be
adjusted after final assembly*
Step 4
Remove (4) #10-24 x ½” pan head screws from the rear of
the shelter, attach the lid to the shelter by placing the lid
hinge plates on the “OUTSIDE” of the shelter, line the
hinges up with the (4) threaded holes in the back of the
shelter. Use the (4) #10-24X ½” pan head screws that were
removed preciously to attach the lid hinges to the shelter.
*Tighten completely*
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com