Loading...
TE-5170D-BL TSP MFC 15 Operations Manual
Electrical Set-Up
Note: Standard 3-prong plug may require adapter for use in global
installations. Please consult your local electrical standards.
1. The TE-5005BL Blower Motor plug connects to the TE-300-310-BL
Mass Flow Controller socket.
2. The Mass Flow Controller plug connects to the TE-303 Digital Timer
timed socket on the left side of timer.
3. The other socket on timer (on the right) is hot all the time and
connects to the TE-5009 Continuous Flow Recorder plug.
4. The plug on timer connects to the line voltage.
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com