Loading...
TE-WILBUR OPERATIONS MANUAL REV 002.22 4/27/2017
Tisch Environmental 1-TSP-AND-PM10 sales@tisch-env.com www.tisch-env.com Page 130 of 185
15. Once the controller is seated on the Din rail properly you must now
reinstall the wiring.
16. Reinstall the (2) Modbus wires onto the Modbus module securing by
tightening the terminal screw.
17. Reinstall the (2) DC Power wires onto the controller securing by
tightening the terminal screw.
18. Reinstall the (5) connectors in their proper locations on the controller
assembly.
19. Plug the communication cable from the screen back into the controller
port on the front.
20. Reinstall the upper and lower front panels and power unit on.
13.10 Flowmeter Replacement
If the thermal mass flowmeter needs replaced, perform the following:
The part number for the thermal mass flowmeter is TE-W-150.
WARNING Before opening covers to perform maintenance, ensure unit is
powered down completely. To power down completely, remove mains power
and disconnect the battery at:
MAIN MENU
MAINTENANCE
MENU
BATTERY
DISCONNECT
1. Remove both the upper and lower left plates using a Phillips
screwdriver.
2. The thermal mass flowmeter is located on the inside right wall (center
divider) of the enclosure.
3. Unplug the connector on the flowmeter by pushing down on the tab on
top and pulling outwards.
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com