Loading...
TE-WILBUR OPERATIONS MANUAL REV 002.22 4/27/2017
Tisch Environmental 1-TSP-AND-PM10 sales@tisch-env.com www.tisch-env.com Page 145 of 185
5. Install the new relay onto the DIN rail it is installed in the same manner
as the controller by placing the top part into the DIN rail groove and
pushing down until a ‘click’ is heard and felt.
6. Reattach the wires by pushing down on the slot with a small flat-head
screwdriver and pushing the wire into the terminal. The wiring
diagram is as follows:
Terminal
Connection
A2
Neutral
A1
Hot
11
DC (-)
12
Controller TB1 Terminal 3
7. Reinstall the upper and lower front panels and power unit on.
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com