10.2 Alarms and Events
The following alarms and events are shown and logged in the history log:
Pump has been started
from the screen
The pump has been started in either manual by pump speed
percentage or by manual, automatic flow control.
Leak check started
Leak check was started.
Leak check passed
Leak check has passed and any leaks are less than 80mL/min.
Leak check failed
Leak check failed and there was a leak greater than 80mL/min.
Leak check failed did
not reach pressure
Indicates the Leak Check Failed due to the 60 second fail timer
ending and the system pressure did not reach 50” H2O. Indicates
the filter holder or valve adapter was not closed.
Flow calibration started
A flow calibration was started.
Flow calibration quit by
operator
A flow calibration was started but was terminated by the operator.
Flow calibration completed
Passed
Flow calibration was completed and R factor was less than 0.98
and passed.
Flow calibration completed
Failed
Flow calibration was completed and R factor was greater than 0.98
and failed.
Flow Check Setpoint 1
Started
Operator performed a flow system verification for setpoint 1.
Flow Check Setpoint 2
Started
Operator performed a flow system verification for setpoint 2.
Flow Check Setpoint 3
Started
Operator performed a flow system verification for setpoint 3.
Flow Check Setpoint 4
Started
Operator performed a flow system verification for setpoint 4.
Sample has been engaged
1in3, 1in6, 1in12 or custom sample is engaged.
Sample has been started
1in3, 1in6, 1in12 or custom sample is started.
1 in 3 sample selected
1in3 sample has been selected and engaged.