Loading...
Excavator
3DMC Reference Guide
12-6
positioned vertically and as high as possible on the
machine to maximize signal reception.
MC-R3 Controller Setup
The MC-R3 Controller is designed for quick
installation at the beginning of the day and quick
removal at the end of the day.
1. Place the MC-R3 Controller in a suitable location
(in the cab) where all four magnets attach to the
machine. The LED lights should be visible to the
operator, and all ports should be accessible to
connect the cables.
2. Attach the following cables to the MC-R3
Controller:
The Connector A Deutsch cable harness to the
GX-60 Display’s upper connector, to the tilt
sensors, and to machine power and ground.
Radio Antenna
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com