Loading...
Glossary
Glossary
124
P-32+ and P-32 Operator’s Manual P/N: 1001547-01
Percent (%) Slope
The unit of measure used for cross slope.
Pull Points
See Tow Points
Push Roller
Rollers mounted at the front of the paver to control the contact area between he paver and the asphalt truck
tires.
Q
Quarter Points
Points on the screed midway between the center and the ends.
R
Ripples
Short frequent changes in the elevation of a mat surface.
S
Screed
The assembly behind the tractor. The screed strikes off, smooths and compacts the paving material into a semi-
finished mat.
Screed Extensions
Attachments for increasing screed width.
Screed Heaters (Burners)
Devices which preheat the screed plate to a temperature approximately that of the material to be laid.
Screed Plate
The bottom plate of the screed.
Slope
The incline of a paving surface perpendicular to the direction of travel expressed by stating the rise or fall of a
percentage of horizontal distance (i.e. 2% slope = 2" of elevation change in 100" of lateral run).
Slope Control
A means for controlling the transverse elevation of the fresh laid mat in relation to the grade.
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com