Loading...
Stringline Setup
Setting Elevated Stringline
89
P-32+ and P-32 Operator’s Manual P/ N: 1001547-01
4. Repeat step 3 on page 88 at each station before starting to cut (Figure 162).
Figure 162: Stringline Set at Desired Elevation
Attaching Stringline to the Grade Stake
Some jobs may require the stringline to be secured directly to the grade stake rather than attached to the clip.
1. Mark the lath with the desired “hike-up” above grade (Figure 163).
Figure 163: Mark Lath w ith Hike-up Height
2. Secure an anchor pin at each end of the stringline and pull the stringline tight.
2.0' Offset
2.0'
2.0%
2
V
2
V
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com