Chapter 5 – Operation
59
5.2. Using the master switch
When Virtual has been selected in the Setup screen (Implement /
Master Switch), the Spreader Master Switch on the Operation screen
turns the spreader system on. This switch does not work if External
ECU Sense is selected as the Master Switch.
The switch also indicates the readiness of the system:
Green
Spreader Controller is on and working. Select the master
switch to turn the spreader off.
White
Spreader Controller is ready to use. Select the master switch
to turn the spreader on.
Red
Spreader Controller is off and cannot be used. Select the
Master Switch to see possible causes of the problem. See the
example below.
Green indicates that the system is ready. Red indicates that the system is
not ready.Select to return to the main screen and complete the
necessary action.
The alarm bell button shows the number of active alarms.