LANDSCAPE MODEL (continued)
Timber Frame Installation Procedure
Step 1
Construct the base for the unit. Ensure base is adequate for the weight of the fire.
Step 2
Call for delivery of the unit, position on the base and fit off gather, flues and termination. Connect
gas and power.
FLUE
GATHER
GAS
POWER
Termination outside
(Horizontal shown)
C
Vertical Termination
Base of unit to
centre of flue
1000 = 1695
1600 = 1637
Back of unit to
centre of flue
(Excluding
25mm standoff)
1000 = 160
1600 = 122
10
Terms of Use | Privacy Policy | DMCA Policy
2006-2021 Rsmanuals.com