12 | P a g e
Cut flue exhaust tube (hot tube) to length
(approximately flush with wall exit). Wall
termination will sit against wall.
Pull flue tube through approx. 100mm further (will
be pushed back once terminal fitted).
Feed power cable through wall and into wall
terminal.
Slide flue onto connection spigot fully. Tighten
clamp fully. Wipe excess silicon, visually check
connection to ensure connection is fully sealed.
Feed air intake flue pipe through location spigot
and fit retaining screw.
Terms of Use | Privacy Policy | DMCA Policy
2006-2021 Rsmanuals.com