ShoreTel 8 Planning and Installation Guide 213
C
HAPTER
16
Installing ShoreGear Voice Switches
This chapter provides planning and installation information for the ShoreGear voice
switches. Information on switch connectors and LEDs can be found in Chapter 13, starting
on page 171.
16.1 Checklist
Review the following topics before proceeding to the next chapter:
16.2 Planning
The requirements to install a ShoreGear voice switch are basically the same as any multisite
installation. Please refer to the previous chapters in this guide for more information.
In summary, you must ensure that:
The IP network between the main and remote site meets the bandwidth, latency,
jitter, and packet loss requirements for a multisite installation.
The IP network between the main and remote site has quality of service in place
such that voice travels ahead of data.
You have appropriate firewall considerations in place, including VPN if applicable.
16.3 Mounting the ShoreGear Voice Switches
To stack the ShoreGear voice switch in a rack:
Step 1 Remove the voice switch from its shipping container.
Step 2 Place the switch on a flat platform, such as a shelf.
Step 3 Up to three switches can be stacked on top of each other.
Task Description
Planning page 213
Mounting the ShoreGear Voice Switches page 213
Installing a Voice Switches page 214
RJ-21X Cable Retainer Installation page 215
ShoreWare Director Switch Configuration page 215
Table 16-1 Installing ShoreTel Voice Switches Checklist
Terms of Use | Privacy Policy | DMCA Policy
2006-2022 Rsmanuals.com