ShoreTel 11.1 191
C
HAPTER
14
Site Requirements and Preparation
This chapter provides information about preparing your site for the ShoreTel system,
including concerns such as physical space, environment, and cabling.
14.1 Checklist
Review the following site requirement topics before proceeding to the next chapter:
14.2 Recommendations
The following recommendations will assist you in planning and preparing your site for the
ShoreTel system.
Hire a cabling contractor to install your racks, patch panels, and cabling.
Have an RJ-48C cable ready for each voice switch.
14.2.1 Switch Models
You can locate the model number of your switches on the rear panel as shown in Figure .
This document distinguishes between switches based on the model number and the
number of RU’s the switch occupies.
Task Description
Recommendations page 191
Voice Switch Requirements page 192
Racks and Cabling page 197
A 19-inch data rack, shelf, and modular patch panels can be
purchased from most major electrical suppliers.
page 198
Table 14-1 Site Requirements and Preparation Checklist
ShoreGear 120 Model Number Label
Terms of Use | Privacy Policy | DMCA Policy
2006-2022 Rsmanuals.com